THERMOCOUPLE,N-1ELMNT,6.4X900LG
Material 4100060845 · THERMOCOUPLE · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100060845
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 10 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 57 d · P80 98 d
- Unit price
- Rp 6.4M (est.)
Recommendation
- 1.Forecast 102 EA/year: 102 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~57 days; expected demand during lead time 16.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 60, order up to 76.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 75 now.
- 5.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
75 EA
Rp 479.9M · order by 01 Oct 2026
Expected arrival ≈ 57 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
60
safety stock 45
Rec. Max
76
order qty 16
Service level
99.9%
stockout risk now 86%
Unit price
Rp 6.4M
Category + unit estimate
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 437 days ago, 60 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 19.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 10 functional locations
5 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 1 | 114 | 42.86 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 1 | 29 | 11.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 1 | 23 | 9.01 |
| PX_KT-856A TURBINE FOR KC-856A | A | 2 | 7 | 2.81 |
| PX_BF-110-PD22 COIL OUTLET BF-110 | C | 1 | 0 | 0.45 |
| PX_TEL-680A-49A CRACKED GAS OUTLET BF-111 | C | 1 | 0 | 0.01 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 2 | 41 | 14.58 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
| PX_KT-624A TURBINE FOR KC-624A | S | 1 | 3 | 2.39 |
Lead time and procurement
Lead time 57 ± 36 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 14 Sept 2026 | Low | PX_BF-105 | Install cover plate BF-105 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Jul 2025 | 1 | 204000037271 | Preventive |
| 21 Jul 2025 | 2 | 204000037271 | Preventive |