THERMOCOUPLE,N-2ELMNT,6.4X3600LG
Material 4100060862 · THERMOCOUPLE · Plant 1000
AReduceNon-moving
- Material
- 4100060862
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (4 of 14 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 57 d · P80 98 d
- Unit price
- Rp 6.4M (est.)
Recommendation
- 1.Forecast 3.1 EA/year: 3.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~57 days; expected demand during lead time 0.5.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.Stock 9 exceeds the level to keep (6) by 3.
- 5.Installed on 14 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
9 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.8%
stockout risk now 0%
Unit price
Rp 6.4M
Category + unit estimate
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 50 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 14 functional locations
4 with criticality A/B · 19 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 2 | 38 | 14.58 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 1 | 23 | 9.01 |
| PX_KT-460B TURBINE FOR KC-460B | A | 3 | 2 | 1.96 |
| PX_TEL-206 TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_TEL-798C PP-1583A OUTLET | C | 1 | 0 | 0.01 |
| PY_TEL-1021B TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 1 | 41 | 14.58 |
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
| PX_BF-112-PD15 QO TO QUENCH FITTING | S | 1 | 1 | 0.45 |
| PX_BF-105-QF11 QO TO QUENCH FITTING | S | 1 | 0 | 0.45 |
| PX_KT-778A TURBINE FOR KC-778A | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 57 ± 36 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
Recent goods issues
Never issued in the 17-month history.