THERMOCOUPLE,K-1ELMNT,3.2X1900LG

Material 4100060882 · THERMOCOUPLE · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100060882
Category
THERMOCOUPLE
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 8 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
76 d · P80 98 d
Unit price
Rp 7.5M

Recommendation

  • 1.Forecast 26 EA/year: 26 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~76 days; expected demand during lead time 5.3.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 26.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 26 now.
  • 5.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 8 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
26 EA
Rp 194.6M · order by 01 Oct 2026
Expected arrival ≈ 76 days
Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 13
Rec. Max
26
order qty 8
Service level
99.9%
stockout risk now 91%
Unit price
Rp 7.5M
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 249 days ago, 52 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 8 functional locations

4 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A47128.72
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_TEL-1249B
TEMPERATURE
A200.01
PX_TEL-1939
TEMPERATURE
C120.44
PX_TEL-1155
HE-1750C OUTLET
C100.01
PX_BF-110
CRACKING FURNACE BF-110
S14114.58
PX_BF-108
CRACKING FURNACE BF-108
S1239.44

Lead time and procurement

Lead time 76 ± 36 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
29 Oct 2025PR06
Regular replenishment
1Rp 7.5M18 Jan 202681 d
07 May 2025PR06
Regular replenishment
2Rp 7.5M11 Sept 2025127 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
25 Jan 20262201000033187Corrective
12 Dec 20251201000021360Corrective