THERMOCOUPLE,K-2ELMNT,6.4X2000LG

Material 4100060900 · THERMOCOUPLE · Plant 1000

ALong-leadReorderCriticalSlow-moving
Material
4100060900
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 10 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
59 d · P80 98 d
Unit price
Rp 7.3M

Recommendation

  • 1.Forecast 16 EA/year: 16 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~59 days; expected demand during lead time 2.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 15.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 13 now.
  • 5.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
  • 7.ML early warning: 36% probability of demand in the next 90 days.
Proposed purchase requisition
13 EA
Rp 95.1M · order by 01 Oct 2026
Expected arrival ≈ 59 days
Long-leadML early warningSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 7
Rec. Max
15
order qty 6
Service level
100.0%
stockout risk now 47%
Unit price
Rp 7.3M
PO history
ML early warning: 36% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 400 days ago, 31 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 10 functional locations

5 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_TEL-919-17B
CL-244 OUTLET
A100.01
PX_BF-105-COIL23
BURNER BF-105
B100.45
PX_TEL-735A-14
TEMPERATURE
B100.01
PX_BF-110
CRACKING FURNACE BF-110
S14114.58
PX_BF-101
CRACKING FURNACE BF-101
S183.02
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-624A
TURBINE FOR KC-624A
S132.39
PX_TEL-766C
TEMPERATURE
S100.01

Lead time and procurement

Lead time 59 ± 36 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
14 Jun 2026PR06
Regular replenishment
1Rp 7.2M15 Aug 202662 d
11 Jan 2026PR03
Regular replenishment
2Rp 7.4M14 Mar 202662 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-110Leak from packing
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102

Recent goods issues

Posting dateQtyOrderOrder type
27 Aug 20251201000038733Corrective