THERMOCOUPLE,N-2ELMNT,3.2X600LG

Material 4100060979 · THERMOCOUPLE · Plant 1000

AReorderCriticalBelow reorder point
Material
4100060979
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
57 d · P80 98 d
Unit price
Rp 6.4M (est.)

Recommendation

  • 1.Forecast 59 EA/year: 59 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~57 days; expected demand during lead time 9.3.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 36, order up to 48.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 47 now.
  • 5.Installed on 8 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
47 EA
Rp 300.7M · order by 01 Oct 2026
Expected arrival ≈ 57 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
36
safety stock 27
Rec. Max
48
order qty 12
Service level
99.9%
stockout risk now 84%
Unit price
Rp 6.4M
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 165 days ago, 61 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 17.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 8 functional locations

6 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_BF-101-QF17
DILUTION STEAM TO MIXED FEED COIL
B100.45
PX_BF-108
CRACKING FURNACE BF-108
S1239.44
PX_TEL-1354A
HE-118B OUTLET
S100.01

Lead time and procurement

Lead time 57 ± 36 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105

Recent goods issues

Posting dateQtyOrderOrder type
19 Apr 20262201000029249Corrective