THERMOCOUPLE,N-1ELMNT,6.4X3400LG

Material 4100061005 · THERMOCOUPLE · Plant 1000

ALong-leadReorderCriticalBelow reorder point
Material
4100061005
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 15 FuncLocs A/B)
Supplier
MEGA TEKNIK MAKMUR PT
Lead time
55 d · P80 98 d
Unit price
Rp 8.4M

Recommendation

  • 1.Forecast 34 EA/year: 34 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 5.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 26.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 25 now.
  • 5.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 15 FuncLoc(s), 7 of them criticality A/B.
Proposed purchase requisition
25 EA
Rp 210.5M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 13
Rec. Max
26
order qty 8
Service level
100.0%
stockout risk now 92%
Unit price
Rp 8.4M
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 5 days ago, 46 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 15 functional locations

7 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_BF-105-DUCT36
COIL OUTLET BF-105
A100.45
PX_TEL-1725A-7
CRACKED GAS OUTLET BF-109
B120.44
PX_BF-105-BRN31
CONVECTION SECTION
C300.45
PX_TEL-304-38B
HE-1744A OUTLET
C100.01
PX_TEL-669
VD-813 OUTLET
C100.01
PY_TEL-1504
TEMPERATURE
C100.01
PX_BF-110
CRACKING FURNACE BF-110
S14114.58

Lead time and procurement

Lead time 55 ± 36 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
19 Apr 2026PR03
Regular replenishment
2Rp 8.4M28 Jun 202670 d
12 Jan 2026PR03
Regular replenishment
2Rp 8.5M17 Feb 202636 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
15 Sept 2026MediumPX_BF-106Install cover plate BF-106

Recent goods issues

Posting dateQtyOrderOrder type
26 Sept 20262201000034306Corrective
11 Nov 20252201000025202Corrective