THERMOCOUPLE,K-1ELMNT,8X1100LG

Material 4100061070 · THERMOCOUPLE · Plant 1000

AReorderNormalSlow-moving
Material
4100061070
Category
THERMOCOUPLE
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
57 d · P80 98 d
Unit price
Rp 6.4M (est.)

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~57 days; expected demand during lead time 0.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 12.8M · order by 01 Oct 2026
Expected arrival ≈ 57 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.4M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 274 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 618.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 6 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-1629D
KC-202 BTM
A100.01
PX_TEL-1989
TEMPERATURE
A100.01
PX_TEL-652A-58A
TEMPERATURE
A100.01
PX_TEL-1910C-31
CRACKED GAS OUTLET BF-105
B100.01
PX_TEL-649A-19B
TEMPERATURE
C100.01
PX_BF-101
CRACKING FURNACE BF-101
S183.02

Lead time and procurement

Lead time 57 ± 36 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
22 Jun 2026LowPX_BF-101Thermograph wall BF-101
06 Jun 2026EmergencyPX_BF-101Decoking follow up BF-101
27 Nov 2025MediumPX_BF-101Peep door broken BF-101
15 Oct 2025MediumPX_BF-101Install scaffolding at BF-101
13 Aug 2025EmergencyPX_BF-101Leak from packing
02 Jun 2025LowPX_BF-101Install cover plate BF-101

Recent goods issues

Posting dateQtyOrderOrder type
31 Dec 20251201000008562Corrective