Sparely
DU

THERMOCOUPLE,K-2ELMNT,6.4X500LG

Material 4100061191 · THERMOCOUPLE · Plant 1000

ALong-leadReorderCriticalSlow-moving
Material
4100061191
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
ANUGRAH TEKNOLOGI INTERNASIONAL PT
Lead time
79 d · P80 125 d
Unit price
Rp 7.2M

Recommendation

  • 1.Forecast 8.8 EA/year: 8.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~79 days; expected demand during lead time 1.9.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 12.
  • 4.On hand 1 + on order 1 is at or below the reorder point: order 10 now.
  • 5.Long lead time: 80% of deliveries took up to 125 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 72.2M · order by 01 Oct 2026
Expected arrival ≈ 79 days
Long-leadSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 07 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
12
order qty 5
Service level
99.9%
stockout risk now 29%
Unit price
Rp 7.2M
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 355 days ago, 11 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-101-QF25
BURNER BF-101
C100.45
PX_KT-202
TURBINE FOR KC-202
S142.81

Lead time and procurement

Lead time 79 ± 39 days (PO history, 3 PO lines) · on-time 23%

PR dateTypeQtyUnit priceDeliveryLead time
16 Jun 2026PR04
Regular (other)
1Rp 7.2M07 Nov 2026
open
144 d
16 Feb 2026PR03
Regular replenishment
2Rp 7.1M23 May 202696 d
23 Dec 2025PR03
Regular replenishment
1Rp 7.3M21 Feb 202660 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
31 Aug 2026MediumPX_BF-112Install cover plate for MCP cracking
17 Aug 2026MediumPX_BF-112Painting BF-112

Recent goods issues

Posting dateQtyOrderOrder type
11 Oct 20251201000022818Corrective