THERMOCOUPLE,J-1ELMNT,3.2X3500LG
Material 4100061222 · THERMOCOUPLE · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100061222
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 5 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 41 d · P80 37 d
- Unit price
- Rp 2.1M
Recommendation
- 1.Forecast 2.7 EA/year: 2.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~41 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 6 now.
- 5.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
- 6.ML early warning: 39% probability of demand in the next 90 days.
Proposed purchase requisition
6 EA
Rp 12.4M · order by 01 Oct 2026
Expected arrival ≈ 41 days
ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 21%
Unit price
Rp 2.1M
PO history
ML early warning: 39% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 220 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 5 functional locations
1 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1638 TEMPERATURE | A | 4 | 0 | 0.01 |
| PX_TEL-1680 HE-812B BTM | C | 1 | 0 | 0.01 |
| PX_TEL-670-59A TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_KT-624A TURBINE FOR KC-624A | S | 4 | 3 | 2.39 |
| PX_TEL-1663A-28B CRACKED GAS OUTLET BF-110 | S | 1 | 2 | 0.87 |
Lead time and procurement
Lead time 41 ± 19 days (PO history, 6 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 May 2026 | PR03 Regular replenishment | 1 | Rp 2.0M | 14 Jun 2026 | 35 d |
| 09 Mar 2026 | PR04 Regular (other) | 1 | Rp 2.1M | 10 Apr 2026 | 32 d |
| 08 Nov 2025 | PR06 Regular replenishment | 2 | Rp 2.0M | 21 Nov 2025 | 13 d |
| 13 Oct 2025 | PR06 Regular replenishment | 3 | Rp 2.1M | 26 Nov 2025 | 44 d |
| 04 Sept 2025 | PR03 Regular replenishment | 1 | Rp 2.1M | 10 Oct 2025 | 36 d |
| 16 Aug 2025 | PR03 Regular replenishment | 2 | Rp 2.0M | 22 Sept 2025 | 37 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Jul 2026 | Medium | PX_KT-624A | [MSI-B-26-RXR-331/M] Replace line |
| 07 Feb 2026 | Medium | PX_KT-624A | Replace lamp as per PM finding |
| 19 Oct 2025 | Medium | PX_TEL-1663A-28B | Install cover plate for MCP cracking |
| 29 Jun 2025 | Medium | PX_TEL-1663A-28B | Repair insulation TEL-1663A-28B |
| 17 Jun 2025 | Medium | PX_KT-624A | [MSI-B-25-SWV-127/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Feb 2026 | 2 | 201000005996 | Corrective |
| 31 Jan 2026 | 1 | 204000034161 | Preventive |
| 30 Jan 2026 | 1 | 204000034161 | Preventive |
| 28 Nov 2025 | 1 | 201000005829 | Corrective |