THERMOCOUPLE,J-2ELMNT,6.4X2400LG
Material 4100061384 · THERMOCOUPLE · Plant 1000
AMonitorInsurance gap
- Material
- 4100061384
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 57 d · P80 98 d
- Unit price
- Rp 6.4M (est.)
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~57 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 6%
Unit price
Rp 6.4M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 239.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 3 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-107 CRACKING FURNACE BF-107 | A | 1 | 23 | 9.01 |
| PX_TEL-735A-14 TEMPERATURE | B | 3 | 0 | 0.01 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 57 ± 36 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 08 Sept 2026 | Medium | PX_BF-107 | Replace lamp as per PM finding |
| 15 Aug 2026 | Medium | PX_BF-107 | Hot spot at convection BF-107 |
| 08 Aug 2026 | Low | PX_BF-107 | Cleaning burner BF-107 |
| 21 Jul 2026 | Medium | PX_BF-107 | Replace lamp as per PM finding |
| 21 Jul 2026 | Medium | PX_BF-107 | Thermograph wall BF-107 |
| 18 Jul 2026 | Emergency | PX_BF-107 | Hot spot at convection BF-107 |
| 10 Jul 2026 | Medium | PX_BF-107 | Hot spot at convection BF-107 |
| 12 Apr 2026 | Medium | PX_BF-107 | Decoking follow up BF-107 |
| 07 Mar 2026 | Medium | PX_BF-107 | Thermograph wall BF-107 |
Recent goods issues
Never issued in the 17-month history.