THERMOCOUPLE,J-2ELMNT,3.2X300LG

Material 4100061476 · THERMOCOUPLE · Plant 1000

ALong-leadMaintainHealthy
Material
4100061476
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
LANGIT MESINDO GLOBAL PT
Lead time
51 d · P80 98 d
Unit price
Rp 1.7M

Recommendation

  • 1.Forecast 42 EA/year: 42 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~51 days; expected demand during lead time 5.9.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 38.
  • 4.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Long-leadSingle source
On hand / on order
34 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 13
Rec. Max
38
order qty 20
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.7M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 36 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 12.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-102
CRACKING FURNACE BF-102
A17128.72

Lead time and procurement

Lead time 51 ± 36 days (PO history + category, 1 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
15 Feb 2026PR06
Regular replenishment
1Rp 1.7M21 Mar 202634 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20262201000029943Corrective