THERMOCOUPLE,K-2ELMNT,6.4X3400LG
Material 4100061538 · THERMOCOUPLE · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100061538
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 58 d · P80 72 d
- Unit price
- Rp 2.9M
Recommendation
- 1.Forecast 9.3 EA/year: 9.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~58 days; expected demand during lead time 1.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 13.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 11 now.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
11 EA
Rp 31.7M · order by 01 Oct 2026
Expected arrival ≈ 58 days
Convert to Stock ItemSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
13
order qty 7
Service level
99.9%
stockout risk now 18%
Unit price
Rp 2.9M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 229 days ago, 28 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 6 functional locations
4 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_BF-107 CRACKING FURNACE BF-107 | A | 1 | 23 | 9.01 |
| PX_TEL-1352-12B TEMPERATURE | A | 1 | 0 | 0.01 |
| PX_TEL-186C-32A PP-1657A BTM | A | 1 | 0 | 0.01 |
| PX_BF-107-PD27 CONVECTION SECTION | C | 1 | 2 | 0.87 |
| PX_TEL-1683 PP-682A OUTLET | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 58 ± 28 days (PO history, 4 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Mar 2026 | PR06 Regular replenishment | 1 | Rp 2.9M | 21 May 2026 | 58 d |
| 18 Aug 2025 | PR03 Regular replenishment | 2 | Rp 2.9M | 23 Oct 2025 | 66 d |
| 17 Aug 2025 | PR06 Regular replenishment | 2 | Rp 2.9M | 13 Sept 2025 | 27 d |
| 23 Jun 2025 | PR06 Regular replenishment | 1 | Rp 2.7M | 12 Sept 2025 | 81 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 24 Sept 2026 | Low | PX_BF-107 | Install scaffolding at BF-107 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 10 Sept 2026 | Medium | PX_BF-106 | Replace burner tip BF-106 |
| 08 Sept 2026 | Low | PX_BF-106 | Leak from packing |
| 08 Sept 2026 | Medium | PX_BF-106 | Painting BF-106 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Feb 2026 | 1 | 201000016599 | Corrective |
| 10 Aug 2025 | 1 | 201000006989 | Corrective |