THERMOCOUPLE,N-1ELMNT,6.4X700LG

Material 4100061684 · THERMOCOUPLE · Plant 1000

ALong-leadReduceNon-moving
Material
4100061684
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
57 d · P80 98 d
Unit price
Rp 5.4M

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~57 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 16 exceeds the level to keep (2) by 14.
  • 5.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
16 / 0
no open PO
Today Min / Max
4 / 7
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 5.4M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 127.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-156
VD-992 OUTLET
A100.01
PX_BF-101
CRACKING FURNACE BF-101
S183.02
PX_KT-264A
TURBINE FOR KC-264A
S142.39

Lead time and procurement

Lead time 57 ± 36 days (PO history + category, 1 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
16 Jan 2026PR03
Regular replenishment
1Rp 5.4M14 Mar 202657 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
22 Jun 2026LowPX_BF-101Thermograph wall BF-101
11 Jun 2026LowPX_KT-264ALeak from packing
06 Jun 2026EmergencyPX_BF-101Decoking follow up BF-101
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
27 Nov 2025MediumPX_BF-101Peep door broken BF-101
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
15 Oct 2025MediumPX_BF-101Install scaffolding at BF-101
13 Aug 2025EmergencyPX_BF-101Leak from packing

Recent goods issues

Never issued in the 17-month history.