THERMOCOUPLE,N-1ELMNT,6.4X700LG
Material 4100061684 · THERMOCOUPLE · Plant 1000
ALong-leadReduceNon-moving
- Material
- 4100061684
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 57 d · P80 98 d
- Unit price
- Rp 5.4M
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~57 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 16 exceeds the level to keep (2) by 14.
- 5.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
16 / 0
no open PO
Today Min / Max
4 / 7
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 5.4M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 127.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-156 VD-992 OUTLET | A | 1 | 0 | 0.01 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 1 | 8 | 3.02 |
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
Lead time and procurement
Lead time 57 ± 36 days (PO history + category, 1 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Jan 2026 | PR03 Regular replenishment | 1 | Rp 5.4M | 14 Mar 2026 | 57 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 16 Aug 2026 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 22 Jun 2026 | Low | PX_BF-101 | Thermograph wall BF-101 |
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 06 Jun 2026 | Emergency | PX_BF-101 | Decoking follow up BF-101 |
| 21 Apr 2026 | Low | PX_KT-264A | Follow up after steam upset KT-264A |
| 27 Nov 2025 | Medium | PX_BF-101 | Peep door broken BF-101 |
| 21 Oct 2025 | Medium | PX_KT-264A | KT-264A governor valve hunting |
| 15 Oct 2025 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 13 Aug 2025 | Emergency | PX_BF-101 | Leak from packing |
Recent goods issues
Never issued in the 17-month history.