THERMOCOUPLE,K-1ELMNT,6.4X600LG

Material 4100061714 · THERMOCOUPLE · Plant 1000

ALong-leadMonitorSlow-moving
Material
4100061714
Category
THERMOCOUPLE
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
60 d · P80 98 d
Unit price
Rp 14.3M

Recommendation

  • 1.Forecast 2.9 EA/year: 2.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~60 days; expected demand during lead time 0.5.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
4 / 3
next delivery 09 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.8%
stockout risk now 0%
Unit price
Rp 14.3M
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 294 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 844.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 3 functional locations

1 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-194
CRACKED GAS OUTLET BF-110
A110.44
PX_TEL-1477
TEMPERATURE
C200.01
PX_BF-101
CRACKING FURNACE BF-101
S383.02

Lead time and procurement

Lead time 60 ± 36 days (PO history + category, 2 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
02 Sept 2026PR04
Regular (other)
3Rp 14.8M09 Dec 2026
open
98 d
08 Feb 2026PR06
Regular replenishment
3Rp 13.8M13 Mar 202633 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
22 Jun 2026LowPX_BF-101Thermograph wall BF-101
06 Jun 2026EmergencyPX_BF-101Decoking follow up BF-101
27 Nov 2025MediumPX_BF-101Peep door broken BF-101
15 Oct 2025MediumPX_BF-101Install scaffolding at BF-101
13 Aug 2025EmergencyPX_BF-101Leak from packing
31 Jul 2025MediumPX_TEL-194Inspection TEL-194.ok
02 Jun 2025LowPX_BF-101Install cover plate BF-101

Recent goods issues

Posting dateQtyOrderOrder type
11 Dec 20251201000008271Corrective
10 Dec 20251201000008271Corrective
10 Dec 20252201000008271Corrective
30 Sept 20252201000033223Corrective