THERMOCOUPLE,K-1ELMNT,6.4X600LG
Material 4100061714 · THERMOCOUPLE · Plant 1000
ALong-leadMonitorSlow-moving
- Material
- 4100061714
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- SINAR SEJAHTERA LESTARI PT
- Lead time
- 60 d · P80 98 d
- Unit price
- Rp 14.3M
Recommendation
- 1.Forecast 2.9 EA/year: 2.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~60 days; expected demand during lead time 0.5.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
4 / 3
next delivery 09 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.8%
stockout risk now 0%
Unit price
Rp 14.3M
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 294 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 844.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 3 functional locations
1 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-194 CRACKED GAS OUTLET BF-110 | A | 1 | 1 | 0.44 |
| PX_TEL-1477 TEMPERATURE | C | 2 | 0 | 0.01 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 3 | 8 | 3.02 |
Lead time and procurement
Lead time 60 ± 36 days (PO history + category, 2 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Sept 2026 | PR04 Regular (other) | 3 | Rp 14.8M | 09 Dec 2026 open | 98 d |
| 08 Feb 2026 | PR06 Regular replenishment | 3 | Rp 13.8M | 13 Mar 2026 | 33 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 16 Aug 2026 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 22 Jun 2026 | Low | PX_BF-101 | Thermograph wall BF-101 |
| 06 Jun 2026 | Emergency | PX_BF-101 | Decoking follow up BF-101 |
| 27 Nov 2025 | Medium | PX_BF-101 | Peep door broken BF-101 |
| 15 Oct 2025 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 13 Aug 2025 | Emergency | PX_BF-101 | Leak from packing |
| 31 Jul 2025 | Medium | PX_TEL-194 | Inspection TEL-194.ok |
| 02 Jun 2025 | Low | PX_BF-101 | Install cover plate BF-101 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Dec 2025 | 1 | 201000008271 | Corrective |
| 10 Dec 2025 | 1 | 201000008271 | Corrective |
| 10 Dec 2025 | 2 | 201000008271 | Corrective |
| 30 Sept 2025 | 2 | 201000033223 | Corrective |