THERMOCOUPLE,J-2ELMNT,3.2X3800LG

Material 4100061807 · THERMOCOUPLE · Plant 1000

AReorderNormalSlow-moving
Material
4100061807
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
57 d · P80 98 d
Unit price
Rp 6.4M (est.)

Recommendation

  • 1.Forecast 4.1 EA/year: 4.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~57 days; expected demand during lead time 0.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 38.4M · order by 01 Oct 2026
Expected arrival ≈ 57 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 3%
Unit price
Rp 6.4M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 245 days ago, 8 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_BF-104-BRN08
COIL OUTLET BF-104
A121.30
PX_BF-108
CRACKING FURNACE BF-108
S1239.44

Lead time and procurement

Lead time 57 ± 36 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
07 Jul 2026MediumPX_BF-104-BRN08Install cover plate for MCP cracking
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
29 Jan 20261201000011155Corrective