THERMOCOUPLE,J-2ELMNT,3.2X1000LG
Material 4100061924 · THERMOCOUPLE · Plant 1000
SMonitorSlow-moving
- Material
- 4100061924
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 57 d · P80 98 d
- Unit price
- Rp 6.4M (est.)
Recommendation
- 1.Forecast 8.8 EA/year: 8.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~57 days; expected demand during lead time 1.4.
- 3.A 50.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 5.
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
5
order qty 5
Service level
50.2%
stockout risk now 50%
Unit price
Rp 6.4M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 215 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 9.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~27 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-110 CRACKING FURNACE BF-110 | S | 1 | 41 | 14.58 |
Lead time and procurement
Lead time 57 ± 36 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 11 Sept 2026 | Medium | PX_BF-110 | Leak from packing |
| 03 Sept 2026 | Low | PX_BF-110 | Hot spot at convection BF-110 |
| 03 Sept 2026 | Medium | PX_BF-110 | Thermograph wall BF-110 |
| 01 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 30 Aug 2026 | Low | PX_BF-110 | Leak from packing |
| 07 Aug 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 07 Aug 2026 | Medium | PX_BF-110 | Painting BF-110 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Feb 2026 | 2 | 201000033452 | Corrective |