Sparely
DU

THERMOCOUPLE,J-2ELMNT,3.2X1000LG

Material 4100061924 · THERMOCOUPLE · Plant 1000

SMonitorSlow-moving
Material
4100061924
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
57 d · P80 98 d
Unit price
Rp 6.4M (est.)

Recommendation

  • 1.Forecast 8.8 EA/year: 8.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~57 days; expected demand during lead time 1.4.
  • 3.A 50.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 5.
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
5
order qty 5
Service level
50.2%
stockout risk now 50%
Unit price
Rp 6.4M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 215 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~27 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-110
CRACKING FURNACE BF-110
S14114.58

Lead time and procurement

Lead time 57 ± 36 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
11 Sept 2026MediumPX_BF-110Leak from packing
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110
01 Sept 2026MediumPX_BF-110Replace burner tip BF-110
30 Aug 2026LowPX_BF-110Leak from packing
07 Aug 2026MediumPX_BF-110Install scaffolding at BF-110
07 Aug 2026MediumPX_BF-110Painting BF-110

Recent goods issues

Posting dateQtyOrderOrder type
28 Feb 20262201000033452Corrective