THERMOCOUPLE,K-2ELMNT,8X2300LG
Material 4100062407 · THERMOCOUPLE · Plant 1000
ALong-leadReduceSlow-moving
- Material
- 4100062407
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- GUNUNG UTAMA LESTARI PT
- Lead time
- 76 d · P80 100 d
- Unit price
- Rp 16.0M
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~76 days; expected demand during lead time 0.1.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 4 exceeds the level to keep (2) by 2.
- 5.Long lead time: 80% of deliveries took up to 100 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
4 / 2
next delivery 21 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.4%
stockout risk now 0%
Unit price
Rp 16.0M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 478 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 302.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
Lead time and procurement
Lead time 76 ± 26 days (PO history, 6 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Jul 2026 | PR03 Regular replenishment | 2 | Rp 15.8M | 21 Oct 2026 open | 91 d |
| 31 May 2026 | PR04 Regular (other) | 2 | Rp 17.0M | 22 Jul 2026 | 52 d |
| 24 Dec 2025 | PR03 Regular replenishment | 2 | Rp 16.1M | 16 Mar 2026 | 82 d |
| 13 Dec 2025 | PR03 Regular replenishment | 2 | Rp 16.8M | 07 Apr 2026 | 115 d |
| 22 Sept 2025 | PR03 Regular replenishment | 2 | Rp 15.7M | 31 Dec 2025 | 100 d |
| 13 Aug 2025 | PR06 Regular replenishment | 2 | Rp 15.8M | 26 Oct 2025 | 74 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Jan 2026 | Medium | PX_KT-513 | KT-513 governor valve hunting |
| 03 May 2025 | Medium | PX_KT-513 | KT-513 governor valve hunting |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jun 2025 | 1 | 201000007157 | Corrective |