THERMOCOUPLE,K-1ELMNT,8X1500LG

Material 4100062495 · THERMOCOUPLE · Plant 1000

ALong-leadReorderCriticalSlow-moving
Material
4100062495
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
89 d · P80 98 d
Unit price
Rp 9.9M

Recommendation

  • 1.Forecast 11 EA/year: 11 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~89 days; expected demand during lead time 2.7.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 13.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 12 now.
  • 5.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
12 EA
Rp 118.6M · order by 01 Oct 2026
Expected arrival ≈ 89 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 6
Rec. Max
13
order qty 5
Service level
99.8%
stockout risk now 76%
Unit price
Rp 9.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 244 days ago, 22 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_TEL-117C-4
TEMPERATURE
B100.01
PX_BF-108
CRACKING FURNACE BF-108
S1239.44

Lead time and procurement

Lead time 89 ± 36 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
14 Feb 2026PR03
Regular replenishment
1Rp 9.9M10 Jun 2026116 d
25 Oct 2025PR01
Import / long-lead
1Rp 9.9M02 Apr 2026159 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
07 Sept 2026MediumPX_BF-108Leak from packing
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102
27 Aug 2026MediumPX_BF-102Decoking follow up BF-102

Recent goods issues

Posting dateQtyOrderOrder type
30 Jan 20261201000011155Corrective