THERMOCOUPLE,K-1ELMNT,8X1500LG
Material 4100062495 · THERMOCOUPLE · Plant 1000
ALong-leadReorderCriticalSlow-moving
- Material
- 4100062495
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 89 d · P80 98 d
- Unit price
- Rp 9.9M
Recommendation
- 1.Forecast 11 EA/year: 11 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~89 days; expected demand during lead time 2.7.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 13.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 12 now.
- 5.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
12 EA
Rp 118.6M · order by 01 Oct 2026
Expected arrival ≈ 89 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 6
Rec. Max
13
order qty 5
Service level
99.8%
stockout risk now 76%
Unit price
Rp 9.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 244 days ago, 22 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_TEL-117C-4 TEMPERATURE | B | 1 | 0 | 0.01 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 1 | 23 | 9.44 |
Lead time and procurement
Lead time 89 ± 36 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Feb 2026 | PR03 Regular replenishment | 1 | Rp 9.9M | 10 Jun 2026 | 116 d |
| 25 Oct 2025 | PR01 Import / long-lead | 1 | Rp 9.9M | 02 Apr 2026 | 159 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
| 30 Aug 2026 | High | PX_BF-102 | Painting BF-102 |
| 27 Aug 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Jan 2026 | 1 | 201000011155 | Corrective |