THERMOCOUPLE,N-2ELMNT,6.4X1600LG
Material 4100062573 · THERMOCOUPLE · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100062573
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 57 d · P80 98 d
- Unit price
- Rp 6.4M (est.)
Recommendation
- 1.Forecast 5.4 EA/year: 5.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~57 days; expected demand during lead time 0.8.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 7 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 44.8M · order by 01 Oct 2026
Expected arrival ≈ 57 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.8%
stockout risk now 21%
Unit price
Rp 6.4M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 416 days ago, 11 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 2 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-111 CRACKING FURNACE BF-111 | A | 1 | 23 | 9.01 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 3 | 23 | 9.44 |
Lead time and procurement
Lead time 57 ± 36 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 12 Aug 2026 | Medium | PX_BF-108 | Peep door broken BF-108 |
| 03 Aug 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
| 27 Jul 2026 | Low | PX_BF-108 | Cleaning burner BF-108 |
| 11 Jul 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Aug 2025 | 1 | 201000021135 | Corrective |