Sparely
DU

THERMOWELL,MODEL VH289,GRAPHITE

Material 4100062609 · THERMOWELL · Plant 1000

BLong-leadReorderCriticalStockout
Material
4100062609
Category
THERMOWELL
Base unit
EA
MRP type
Non Stock
Criticality
B (2 of 7 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
85 d · P80 140 d
Unit price
Rp 4.7M

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~85 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 140 days and the fastest seen in its category 43 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 14.1M · order by 01 Oct 2026
Expected arrival ≈ 85 days
Long-leadLast turnaround used 3Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 14%
Unit price
Rp 4.7M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 211 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (3 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 145.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~43 days.

Installed on 7 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-109B
HE-308C BTM
B100.01
PX_TEL-1323-44B
CRACKED GAS OUTLET BF-102
B100.01
PX_TEL-1049C
TEMPERATURE
C120.44
PX_TEL-1086
TEMPERATURE
C100.01
PX_TEL-806B
TEMPERATURE
S120.87
PX_TEL-1223B
TEMPERATURE
S200.01
PX_TEL-139A
TEMPERATURE
S100.01

Lead time and procurement

Lead time 85 ± 40 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
12 Jun 2026PR05
Project / turnaround
2Rp 4.7M25 Sept 2026105 d
13 Jun 2025PR03
Regular replenishment
1Rp 4.6M06 Sept 202585 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Mar 2026EmergencyPX_TEL-806BLeak from packing
26 Dec 2025MediumPX_TEL-1049CLeak from packing
06 Jul 2025MediumPX_TEL-806BInspection TEL-806B.ok
02 May 2025LowPX_TEL-1049CReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
04 Mar 20261201000019278Corrective
29 Nov 20251203000012255Turnaround
28 Nov 20251203000012255Turnaround
26 Nov 20251203000012255Turnaround