THERMOWELL,MODEL VH289,GRAPHITE
Material 4100062609 · THERMOWELL · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4100062609
- Category
- THERMOWELL
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (2 of 7 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 85 d · P80 140 d
- Unit price
- Rp 4.7M
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~85 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 140 days and the fastest seen in its category 43 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 14.1M · order by 01 Oct 2026
Expected arrival ≈ 85 days
Long-leadLast turnaround used 3Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 14%
Unit price
Rp 4.7M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 211 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (3 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 145.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~43 days.
Installed on 7 functional locations
2 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-109B HE-308C BTM | B | 1 | 0 | 0.01 |
| PX_TEL-1323-44B CRACKED GAS OUTLET BF-102 | B | 1 | 0 | 0.01 |
| PX_TEL-1049C TEMPERATURE | C | 1 | 2 | 0.44 |
| PX_TEL-1086 TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_TEL-806B TEMPERATURE | S | 1 | 2 | 0.87 |
| PX_TEL-1223B TEMPERATURE | S | 2 | 0 | 0.01 |
| PX_TEL-139A TEMPERATURE | S | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 85 ± 40 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Jun 2026 | PR05 Project / turnaround | 2 | Rp 4.7M | 25 Sept 2026 | 105 d |
| 13 Jun 2025 | PR03 Regular replenishment | 1 | Rp 4.6M | 06 Sept 2025 | 85 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Mar 2026 | Emergency | PX_TEL-806B | Leak from packing |
| 26 Dec 2025 | Medium | PX_TEL-1049C | Leak from packing |
| 06 Jul 2025 | Medium | PX_TEL-806B | Inspection TEL-806B.ok |
| 02 May 2025 | Low | PX_TEL-1049C | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Mar 2026 | 1 | 201000019278 | Corrective |
| 29 Nov 2025 | 1 | 203000012255 | Turnaround |
| 28 Nov 2025 | 1 | 203000012255 | Turnaround |
| 26 Nov 2025 | 1 | 203000012255 | Turnaround |