THERMOWELL,MODEL XD472,CS
Material 4100062639 · THERMOWELL · Plant 1000
AReduceSlow-moving
- Material
- 4100062639
- Category
- THERMOWELL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 78 d · P80 140 d
- Unit price
- Rp 6.1M (est.)
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~78 days; expected demand during lead time 0.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 5 exceeds the level to keep (2) by 3.
- 5.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.1M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 493 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 214.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~43 days.
Installed on 8 functional locations
2 with criticality A/B · 10 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-503C-22B TEMPERATURE | A | 3 | 0 | 0.01 |
| PX_TEL-1314A TEMPERATURE | B | 1 | 1 | 0.01 |
| PX_TEL-1176B-34A PP-1726 OUTLET | C | 1 | 0 | 0.01 |
| PX_TEL-1360D-46A CRACKED GAS OUTLET BF-105 | C | 1 | 0 | 0.01 |
| PX_TEL-206 TEMPERATURE | C | 1 | 0 | 0.01 |
| PY_TEL-1021B TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_BF-111-PD03 COIL OUTLET BF-111 | S | 1 | 0 | 0.45 |
| PX_TEL-984 HE-187B OUTLET | S | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 78 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 May 2025 | Low | PX_TEL-1314A | Inspection TEL-1314A.ok |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 May 2025 | 1 | 201000027654 | Corrective |