THERMOWELL,MODEL IR194,NBR
Material 4100062787 · THERMOWELL · Plant 1000
BReorderNormalSlow-moving
- Material
- 4100062787
- Category
- THERMOWELL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 78 d · P80 140 d
- Unit price
- Rp 6.1M (est.)
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~78 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 1 now.
- 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 6.1M · order by 01 Oct 2026
Expected arrival ≈ 78 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 6.1M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 346 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 65.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~43 days.
Installed on 5 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1477A-44 TEMPERATURE | B | 1 | 0 | 0.01 |
| PX_TEL-735A-14 TEMPERATURE | B | 1 | 0 | 0.01 |
| PX_TEL-556A VD-1620 OUTLET | C | 1 | 2 | 0.44 |
| PY_TEL-362D TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_TEL-1908-3A TEMPERATURE | S | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 78 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Jan 2026 | Low | PX_TEL-556A | Install cover plate for MCP cracking |
| 02 May 2025 | Low | PX_TEL-556A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Oct 2025 | 1 | 201000007737 | Corrective |