THERMOWELL,TYPE QW45,PTFE
Material 4100062937 · THERMOWELL · Plant 1000
BLong-leadReduceNon-moving
- Material
- 4100062937
- Category
- THERMOWELL
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 77 d · P80 140 d
- Unit price
- Rp 5.0M
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~77 days; expected demand during lead time 0.0.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 3 exceeds the level to keep (1) by 2.
- 5.Long lead time: 80% of deliveries took up to 140 days and the fastest seen in its category 43 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 5.0M
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~43 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1060 HE-1287D BTM | B | 1 | 0 | 0.01 |
| PX_BF-109-PD08 COIL OUTLET BF-109 | S | 1 | 0 | 0.45 |
Lead time and procurement
Lead time 77 ± 40 days (PO history + category, 2 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Apr 2026 | PR04 Regular (other) | 1 | Rp 4.9M | 28 Jul 2026 | 100 d |
| 18 Aug 2025 | PR03 Regular replenishment | 1 | Rp 5.0M | 08 Oct 2025 | 51 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.