THERMOWELL,SIZE MM727,CS
Material 4100062995 · THERMOWELL · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100062995
- Category
- THERMOWELL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- PRIMA SUPLINDO JAYA PT
- Lead time
- 103 d · P80 140 d
- Unit price
- Rp 4.4M
Recommendation
- 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~103 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 140 days and the fastest seen in its category 43 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 13.3M · order by 01 Oct 2026
Expected arrival ≈ 103 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.9%
stockout risk now 18%
Unit price
Rp 4.4M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 124 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 649.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~43 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1452-37A PP-1325 BTM | A | 1 | 0 | 0.01 |
| PX_BF-103-DUCT22 PEEP DOOR | B | 1 | 3 | 1.30 |
Lead time and procurement
Lead time 103 ± 40 days (PO history + category, 2 PO lines) · on-time 32%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Apr 2026 | PR03 Regular replenishment | 2 | Rp 4.4M | 06 Jul 2026 | 84 d |
| 16 Jan 2026 | PR03 Regular replenishment | 2 | Rp 4.5M | 03 Aug 2026 | 199 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Jul 2026 | Medium | PX_BF-103-DUCT22 | Painting BF-103-DUCT22 |
| 10 Sept 2025 | Medium | PX_BF-103-DUCT22 | Cleaning burner BF-103-DUCT22 |
| 23 Jun 2025 | Low | PX_BF-103-DUCT22 | Replace burner tip BF-103-DUCT22 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 May 2026 | 1 | 201000014554 | Corrective |