Sparely
DU

GAUGE,PRESSURE,0-100KG/CM2,6IN DIAL

Material 4100064297 · GAUGE · Plant 1000

AReduceExcess
Material
4100064297
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 22 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
35 d · P80 55 d
Unit price
Rp 3.3M

Recommendation

  • 1.Forecast 3.3 EA/year: 3.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~35 days; expected demand during lead time 0.3.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.Stock 9 exceeds the level to keep (8) by 1.
  • 5.Installed on 22 FuncLoc(s), 7 of them criticality A/B.
  • 6.ML early warning: 68% probability of demand in the next 90 days.
ML early warningSingle sourceSame description as 9 other material numbers
On hand / on order
9 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.3M
PO history
ML early warning: 68% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 156 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 548.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 22 functional locations

7 with criticality A/B · 28 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-246B
PRESSURE GAUGE
A100.02
PX_PGI-527C
PP-1158B BTM
A100.02
PX_PGI-1310
HE-1603 SUCTION
B110.02
PX_PGI-1180-44A
PP-785A BTM
B100.02
PX_PGI-1499A
VD-1044 DISCHARGE
B100.02
PX_PGI-1703
PRESSURE GAUGE
B400.02
PX_PGI-1924D-39B
PP-596A SUCTION
B300.02
PX_PGI-147
KC-830D BTM
C141.73
PX_PGI-1049
HE-1624 SUCTION
C100.02
PX_PGI-1090-17B
VD-1447 SUCTION
C200.02
PX_PGI-1283-59
PP-1168D BTM
C100.02
PX_PGI-1488-57A
PRESSURE GAUGE
C100.02

Lead time and procurement

Lead time 35 ± 24 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
17 Apr 2026PR05
Project / turnaround
3Rp 3.2M10 Jun 202654 d
07 Oct 2025PR03
Regular replenishment
2Rp 3.4M28 Oct 202521 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026MediumPX_PGI-147Replace PGI-147
06 Mar 2026EmergencyPX_PGI-147Repair insulation PGI-147
03 Oct 2025EmergencyPX_PGI-147[MSI-B-25-GSG-347/M] Replace line
16 Jul 2025LowPX_PGI-147Replace lamp as per PM finding
20 May 2025MediumPX_PGI-1310[MSI-B-25-CHV-140] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
28 Apr 20261201000002499Corrective
27 Apr 20261201000002499Corrective
27 Apr 20263201000002499Corrective
26 Sept 20251201000037013Corrective