GAUGE,PRESSURE,0-100KG/CM2,6IN DIAL
Material 4100064297 · GAUGE · Plant 1000
AReduceExcess
- Material
- 4100064297
- Category
- GAUGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (7 of 22 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 35 d · P80 55 d
- Unit price
- Rp 3.3M
Recommendation
- 1.Forecast 3.3 EA/year: 3.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~35 days; expected demand during lead time 0.3.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 4.Stock 9 exceeds the level to keep (8) by 1.
- 5.Installed on 22 FuncLoc(s), 7 of them criticality A/B.
- 6.ML early warning: 68% probability of demand in the next 90 days.
ML early warningSingle sourceSame description as 9 other material numbers
On hand / on order
9 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.3M
PO history
ML early warning: 68% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 156 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 548.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 22 functional locations
7 with criticality A/B · 28 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PGI-246B PRESSURE GAUGE | A | 1 | 0 | 0.02 |
| PX_PGI-527C PP-1158B BTM | A | 1 | 0 | 0.02 |
| PX_PGI-1310 HE-1603 SUCTION | B | 1 | 1 | 0.02 |
| PX_PGI-1180-44A PP-785A BTM | B | 1 | 0 | 0.02 |
| PX_PGI-1499A VD-1044 DISCHARGE | B | 1 | 0 | 0.02 |
| PX_PGI-1703 PRESSURE GAUGE | B | 4 | 0 | 0.02 |
| PX_PGI-1924D-39B PP-596A SUCTION | B | 3 | 0 | 0.02 |
| PX_PGI-147 KC-830D BTM | C | 1 | 4 | 1.73 |
| PX_PGI-1049 HE-1624 SUCTION | C | 1 | 0 | 0.02 |
| PX_PGI-1090-17B VD-1447 SUCTION | C | 2 | 0 | 0.02 |
| PX_PGI-1283-59 PP-1168D BTM | C | 1 | 0 | 0.02 |
| PX_PGI-1488-57A PRESSURE GAUGE | C | 1 | 0 | 0.02 |
Lead time and procurement
Lead time 35 ± 24 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Apr 2026 | PR05 Project / turnaround | 3 | Rp 3.2M | 10 Jun 2026 | 54 d |
| 07 Oct 2025 | PR03 Regular replenishment | 2 | Rp 3.4M | 28 Oct 2025 | 21 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 17 Sept 2026 | Medium | PX_PGI-147 | Replace PGI-147 |
| 06 Mar 2026 | Emergency | PX_PGI-147 | Repair insulation PGI-147 |
| 03 Oct 2025 | Emergency | PX_PGI-147 | [MSI-B-25-GSG-347/M] Replace line |
| 16 Jul 2025 | Low | PX_PGI-147 | Replace lamp as per PM finding |
| 20 May 2025 | Medium | PX_PGI-1310 | [MSI-B-25-CHV-140] Permanent repair |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Apr 2026 | 1 | 201000002499 | Corrective |
| 27 Apr 2026 | 1 | 201000002499 | Corrective |
| 27 Apr 2026 | 3 | 201000002499 | Corrective |
| 26 Sept 2025 | 1 | 201000037013 | Corrective |