GAUGE,PRESSURE,0-10KG/CM2,4IN DIAL

Material 4100064328 · GAUGE · Plant 1000

AReduceSlow-moving
Material
4100064328
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 15 FuncLocs A/B)
Supplier
PRIMA SUPLINDO JAYA PT
Lead time
52 d · P80 89 d
Unit price
Rp 907,440

Recommendation

  • 1.Forecast 4.0 EA/year: 4.0 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~52 days; expected demand during lead time 0.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
  • 4.Stock 51 exceeds the level to keep (10) by 41.
  • 5.Installed on 15 FuncLoc(s), 6 of them criticality A/B.
  • 6.ML early warning: 58% probability of demand in the next 90 days.
ML early warningSingle sourceAbnormal consumptionSame description as 5 other material numbers
On hand / on order
51 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
99.9%
stockout risk now 0%
Unit price
Rp 907,440
PO history
ML early warning: 58% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 252 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 7 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 846.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 15 functional locations

6 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1610
PRESSURE GAUGE
A100.02
PX_PGI-1304C
PP-1309C SUCTION
B110.44
PX_PGI-1703
PRESSURE GAUGE
B100.02
PX_PGI-1924D-39B
PP-596A SUCTION
B100.02
PX_PGI-1932
PRESSURE GAUGE
B100.02
PY_PGI-1988A
PP-807B BTM
B100.02
PX_PGI-147
KC-830D BTM
C141.73
PX_PGI-1168C
PRESSURE GAUGE
C100.02
PX_PGI-1283-59
PP-1168D BTM
C100.02
PX_PGI-1570-37A
PRESSURE GAUGE
C100.02
PX_PGI-1795
PRESSURE GAUGE
C300.02
PX_PGI-331
PP-1352 DISCHARGE
C100.02

Lead time and procurement

Lead time 52 ± 27 days (PO history, 4 PO lines) · on-time 32%

PR dateTypeQtyUnit priceDeliveryLead time
15 Jun 2026PR06
Regular replenishment
4Rp 902,49526 Sept 2026103 d
16 Oct 2025PR06
Regular replenishment
6Rp 912,38428 Nov 202543 d
10 Oct 2025PR03
Regular replenishment
7Rp 916,79820 Nov 202541 d
25 Jun 2025PR03
Regular replenishment
3Rp 866,61612 Sept 202579 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026MediumPX_PGI-147Replace PGI-147
06 Mar 2026EmergencyPX_PGI-147Repair insulation PGI-147
03 Oct 2025EmergencyPX_PGI-147[MSI-B-25-GSG-347/M] Replace line
24 Jul 2025MediumPX_PGI-1304CReplace PGI-1304C
16 Jul 2025LowPX_PGI-147Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
22 Jan 20261201000029233Corrective
28 Dec 20251201000031912Corrective
27 Dec 20251201000031912Corrective
19 Aug 20251201000028209Corrective
19 Aug 20252201000029070Corrective
28 Jul 20254201000016113Corrective
27 Jul 20251201000016113Corrective
26 Jul 20251201000016113Corrective