GAUGE,PRESSURE,0-16KG/CM2,6IN DIAL

Material 4100064350 · GAUGE · Plant 1000

BMonitorStockout
Material
4100064350
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 8 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
35 d · P80 56 d
Unit price
Rp 4.7M

Recommendation

  • 1.Forecast 3.8 EA/year: 3.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~35 days; expected demand during lead time 0.4.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
  • 5.ML early warning: 52% probability of demand in the next 90 days.
ML early warningSingle sourceOpen POSame description as 2 other material numbers
On hand / on order
0 / 9
next delivery 08 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.6%
stockout risk now 0%
Unit price
Rp 4.7M
PO history
ML early warning: 52% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 264 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 80.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 8 functional locations

2 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1932
PRESSURE GAUGE
B100.02
PY_PGI-1527A
PRESSURE GAUGE
B100.02
PX_PGI-1463
KC-669 SUCTION
C110.44
PX_PGI-1318A-17
KC-284A DISCHARGE
C300.02
PX_PGI-1447
PRESSURE GAUGE
C100.02
PX_PGI-1511
VD-262 DISCHARGE
C100.02
PX_PGI-628B
PP-883B DISCHARGE
C100.02
PX_PGI-800
VD-894B SUCTION
C100.02

Lead time and procurement

Lead time 35 ± 20 days (PO history, 6 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
13 Aug 2026PR03
Regular replenishment
9Rp 4.8M08 Oct 2026
open
56 d
08 Aug 2026PR03
Regular replenishment
3Rp 4.5M02 Sept 202625 d
14 May 2026PR06
Regular replenishment
8Rp 4.8M28 May 202614 d
28 Feb 2026PR03
Regular replenishment
4Rp 4.5M03 Apr 202634 d
16 Dec 2025PR03
Regular replenishment
6Rp 4.6M12 Feb 202658 d
06 Oct 2025PR03
Regular replenishment
7Rp 4.7M07 Nov 202532 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Jun 2025LowPX_PGI-1463Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
10 Jan 20262204000030643Preventive
09 Jan 20267201000034348Corrective
10 Jun 20252201000022642Corrective
10 Jun 20251201000022642Corrective