GAUGE,PRESSURE,0-16KG/CM2,6IN DIAL
Material 4100064350 · GAUGE · Plant 1000
BMonitorStockout
- Material
- 4100064350
- Category
- GAUGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 8 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 35 d · P80 56 d
- Unit price
- Rp 4.7M
Recommendation
- 1.Forecast 3.8 EA/year: 3.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~35 days; expected demand during lead time 0.4.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 4.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 52% probability of demand in the next 90 days.
ML early warningSingle sourceOpen POSame description as 2 other material numbers
On hand / on order
0 / 9
next delivery 08 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.6%
stockout risk now 0%
Unit price
Rp 4.7M
PO history
ML early warning: 52% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 264 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 80.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.
Installed on 8 functional locations
2 with criticality A/B · 10 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PGI-1932 PRESSURE GAUGE | B | 1 | 0 | 0.02 |
| PY_PGI-1527A PRESSURE GAUGE | B | 1 | 0 | 0.02 |
| PX_PGI-1463 KC-669 SUCTION | C | 1 | 1 | 0.44 |
| PX_PGI-1318A-17 KC-284A DISCHARGE | C | 3 | 0 | 0.02 |
| PX_PGI-1447 PRESSURE GAUGE | C | 1 | 0 | 0.02 |
| PX_PGI-1511 VD-262 DISCHARGE | C | 1 | 0 | 0.02 |
| PX_PGI-628B PP-883B DISCHARGE | C | 1 | 0 | 0.02 |
| PX_PGI-800 VD-894B SUCTION | C | 1 | 0 | 0.02 |
Lead time and procurement
Lead time 35 ± 20 days (PO history, 6 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Aug 2026 | PR03 Regular replenishment | 9 | Rp 4.8M | 08 Oct 2026 open | 56 d |
| 08 Aug 2026 | PR03 Regular replenishment | 3 | Rp 4.5M | 02 Sept 2026 | 25 d |
| 14 May 2026 | PR06 Regular replenishment | 8 | Rp 4.8M | 28 May 2026 | 14 d |
| 28 Feb 2026 | PR03 Regular replenishment | 4 | Rp 4.5M | 03 Apr 2026 | 34 d |
| 16 Dec 2025 | PR03 Regular replenishment | 6 | Rp 4.6M | 12 Feb 2026 | 58 d |
| 06 Oct 2025 | PR03 Regular replenishment | 7 | Rp 4.7M | 07 Nov 2025 | 32 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Jun 2025 | Low | PX_PGI-1463 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jan 2026 | 2 | 204000030643 | Preventive |
| 09 Jan 2026 | 7 | 201000034348 | Corrective |
| 10 Jun 2025 | 2 | 201000022642 | Corrective |
| 10 Jun 2025 | 1 | 201000022642 | Corrective |