GAUGE,PRESSURE,0-10KG/CM2,6IN DIAL

Material 4100064369 · GAUGE · Plant 1000

BMonitorSlow-moving
Material
4100064369
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
33 d · P80 55 d
Unit price
Rp 2.7M (est.)

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~33 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.7M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 410 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 41.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 3 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1223
VD-444B DISCHARGE
B110.02
PX_PGI-1657
HE-556A SUCTION
C231.30
PX_PGI-1208C
PRESSURE GAUGE
C100.02

Lead time and procurement

Lead time 33 ± 24 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_PGI-1657Inspection PGI-1657.ok
01 Sept 2025LowPX_PGI-1657PGI-1657 broken
21 Jul 2025MediumPX_PGI-1657[MSI-B-25-XEN-357/M] Replace line
06 May 2025MediumPX_PGI-1223Install scaffolding at PGI-1223

Recent goods issues

Posting dateQtyOrderOrder type
17 Aug 20251201000010881Corrective