GAUGE,PRESSURE,0-16KG/CM2,4IN DIAL

Material 4100064393 · GAUGE · Plant 1000

ATransferNormalSlow-moving
Material
4100064393
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 10 FuncLocs A/B)
Supplier
No PO history
Lead time
33 d · P80 55 d
Unit price
Rp 2.7M (est.)

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~33 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 1 needed.
  • 5.Installed on 10 FuncLoc(s), 3 of them criticality A/B.
  • 6.Identical part 4100064605 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.7M
Category + unit estimate
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 370 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 99.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 10 functional locations

3 with criticality A/B · 15 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1763B
VD-706A SUCTION
A110.02
PX_PGI-1480-8B
CL-1708 BTM
A100.02
PX_PGI-246B
PRESSURE GAUGE
A400.02
PX_PGI-522D
BF-103 DISCHARGE
C120.44
PX_PGI-1090-17B
VD-1447 SUCTION
C100.02
PX_PGI-1447
PRESSURE GAUGE
C300.02
PX_PGI-1673D
HE-274C BTM
C100.02
PX_PGI-492
VD-1222 DISCHARGE
C100.02
PX_PGI-870A-24B
VD-1861 DISCHARGE
C100.02
PY_PGI-1049
VD-719 BTM
C100.02

Lead time and procurement

Lead time 33 ± 24 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Apr 2026MediumPX_PGI-522DInspection PGI-522D.ok
21 May 2025LowPX_PGI-522DPGI-522D broken
10 May 2025MediumPX_PGI-1763BInstall scaffolding at PGI-1763B

Recent goods issues

Posting dateQtyOrderOrder type
26 Sept 20251201000037013Corrective