GAUGE,PRESSURE,0-16KG/CM2,4IN DIAL
Material 4100064393 · GAUGE · Plant 1000
ATransferNormalSlow-moving
- Material
- 4100064393
- Category
- GAUGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 10 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 33 d · P80 55 d
- Unit price
- Rp 2.7M (est.)
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~33 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 1 + on order 0 is at or below the reorder point: 1 needed.
- 5.Installed on 10 FuncLoc(s), 3 of them criticality A/B.
- 6.Identical part 4100064605 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.7M
Category + unit estimate
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 370 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 99.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 10 functional locations
3 with criticality A/B · 15 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PGI-1763B VD-706A SUCTION | A | 1 | 1 | 0.02 |
| PX_PGI-1480-8B CL-1708 BTM | A | 1 | 0 | 0.02 |
| PX_PGI-246B PRESSURE GAUGE | A | 4 | 0 | 0.02 |
| PX_PGI-522D BF-103 DISCHARGE | C | 1 | 2 | 0.44 |
| PX_PGI-1090-17B VD-1447 SUCTION | C | 1 | 0 | 0.02 |
| PX_PGI-1447 PRESSURE GAUGE | C | 3 | 0 | 0.02 |
| PX_PGI-1673D HE-274C BTM | C | 1 | 0 | 0.02 |
| PX_PGI-492 VD-1222 DISCHARGE | C | 1 | 0 | 0.02 |
| PX_PGI-870A-24B VD-1861 DISCHARGE | C | 1 | 0 | 0.02 |
| PY_PGI-1049 VD-719 BTM | C | 1 | 0 | 0.02 |
Lead time and procurement
Lead time 33 ± 24 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Apr 2026 | Medium | PX_PGI-522D | Inspection PGI-522D.ok |
| 21 May 2025 | Low | PX_PGI-522D | PGI-522D broken |
| 10 May 2025 | Medium | PX_PGI-1763B | Install scaffolding at PGI-1763B |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Sept 2025 | 1 | 201000037013 | Corrective |