Sparely
DU

GAUGE,PRESSURE,0-100KG/CM2,4IN DIAL

Material 4100064414 · GAUGE · Plant 1000

AMaintainHealthy
Material
4100064414
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
30 d · P80 31 d
Unit price
Rp 4.9M

Recommendation

  • 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~30 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Single sourceSame description as 1 other material number
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 4.9M
PO history
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 54 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 425.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PGI-673B
PRESSURE GAUGE
A100.02
PX_PGI-281-55A
PP-319 BTM
C100.02
PX_PGI-636A
HE-1188D DISCHARGE
C100.02

Lead time and procurement

Lead time 30 ± 16 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
22 Jun 2026PR01
Import / long-lead
2Rp 4.9M20 Jul 202628 d
30 Apr 2026PR03
Regular replenishment
2Rp 4.7M02 Jun 202633 d
02 Dec 2025PR06
Regular replenishment
2Rp 4.9M19 Dec 202517 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
08 Aug 20261202000039090Emergency
21 Jul 20261204000012433Preventive