Sparely
DU

GAUGE,PRESSURE,0-40KG/CM2,6IN DIAL

Material 4100064430 · GAUGE · Plant 1000

ATransferNormalSlow-moving
Material
4100064430
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
29 d · P80 55 d
Unit price
Rp 806,085

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 1 needed.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100065283 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Single sourceSame description as 4 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 806,085
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 350 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 52.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 4 functional locations

2 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1480-8B
CL-1708 BTM
A100.02
PY_PGI-1527A
PRESSURE GAUGE
B300.02
PX_PGI-180B-35B
PP-1583A BTM
C100.02
PX_PGI-595B
HE-1392 DISCHARGE
C100.02

Lead time and procurement

Lead time 29 ± 24 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
28 Sept 2025PR03
Regular replenishment
1Rp 806,08513 Oct 202515 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
16 Oct 20251201000017834Corrective