Sparely
DU

GAUGE,PRESSURE,0-16KG/CM2,4IN DIAL

Material 4100064593 · GAUGE · Plant 1000

BReduceSlow-moving
Material
4100064593
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 5 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
52 d · P80 55 d
Unit price
Rp 1.2M

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~52 days; expected demand during lead time 0.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 5 exceeds the level to keep (2) by 3.
  • 5.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
Single sourceSame description as 4 other material numbers
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 1.2M
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 364 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 34.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 5 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1499A
VD-1044 DISCHARGE
B100.02
PX_PGI-1115-6
HE-819 SUCTION
C100.02
PX_PGI-1127-21
PRESSURE GAUGE
C100.02
PX_PGI-1232C
PRESSURE GAUGE
C100.02
PX_PGI-193
PP-224 SUCTION
C100.02

Lead time and procurement

Lead time 52 ± 24 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
23 Apr 2026PR03
Regular replenishment
2Rp 1.2M18 Aug 2026117 d
07 Dec 2025PR03
Regular replenishment
2Rp 1.2M20 Jan 202644 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
02 Oct 20251201000017851Corrective
30 Sept 20251201000021509Corrective