GAUGE,PRESSURE,0-10KG/CM2,4IN DIAL
Material 4100064651 · GAUGE · Plant 1000
CMonitorSlow-moving
- Material
- 4100064651
- Category
- GAUGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 32 d · P80 55 d
- Unit price
- Rp 626,264
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~32 days; expected demand during lead time 0.1.
- 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
Single sourceOpen POSame description as 5 other material numbers
On hand / on order
1 / 1
next delivery 11 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
98.1%
stockout risk now 2%
Unit price
Rp 626,264
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 243 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~15 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PGI-1075A VD-1416A BTM | C | 1 | 1 | 0.02 |
| PX_PGI-423B PRESSURE GAUGE | C | 1 | 1 | 0.02 |
| PX_PGI-227A-9B HE-394 BTM | C | 1 | 0 | 0.02 |
Lead time and procurement
Lead time 32 ± 24 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Sept 2026 | PR03 Regular replenishment | 1 | Rp 626,264 | 11 Oct 2026 open | 27 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 May 2025 | Medium | PX_PGI-1075A | Install scaffolding at PGI-1075A |
| 24 May 2025 | Low | PX_PGI-423B | PSM25/Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Jan 2026 | 4 | 201000038397 | Corrective |