GAUGE,PRESSURE,0-40KG/CM2,4IN DIAL
Material 4100065405 · GAUGE · Plant 1000
CMaintainHealthy
- Material
- 4100065405
- Category
- GAUGE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- BERKAH ELEKTRIK SENTOSA PT
- Lead time
- 41 d · P80 55 d
- Unit price
- Rp 4.6M
Recommendation
- 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~41 days; expected demand during lead time 0.1.
- 3.A 88.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single sourceSame description as 4 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
88.1%
stockout risk now 0%
Unit price
Rp 4.6M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 93 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~15 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PGI-429C HE-179D BTM | C | 1 | 1 | 0.02 |
Lead time and procurement
Lead time 41 ± 24 days (PO history + category, 2 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Aug 2026 | PR06 Regular replenishment | 1 | Rp 4.6M | 29 Sept 2026 | 49 d |
| 10 May 2025 | PR03 Regular replenishment | 1 | Rp 4.6M | 04 Jul 2025 | 55 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Jun 2025 | Medium | PX_PGI-429C | Install scaffolding at PGI-429C |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Jun 2026 | 1 | 201000016139 | Corrective |
| 29 Jun 2026 | 1 | 201000016139 | Corrective |