Sparely
DU

GAUGE,PRESSURE,0-100KG/CM2,6IN DIAL

Material 4100065685 · GAUGE · Plant 1000

CMonitorSlow-moving
Material
4100065685
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
33 d · P80 55 d
Unit price
Rp 2.7M (est.)

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~33 days; expected demand during lead time 0.1.
  • 3.A 96.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
96.5%
stockout risk now 3%
Unit price
Rp 2.7M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 371 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~15 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1127-21
PRESSURE GAUGE
C100.02

Lead time and procurement

Lead time 33 ± 24 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
25 Sept 20251201000018312Corrective
24 Sept 20252201000018312Corrective