GAUGE,PRESSURE,0-10KG/CM2,6IN DIAL

Material 4100065920 · GAUGE · Plant 1000

BReduceSlow-moving
Material
4100065920
Category
GAUGE
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
HOKUTO INSTRUMENT CO LTD
Lead time
32 d · P80 55 d
Unit price
Rp 3.2M

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~32 days; expected demand during lead time 0.0.
  • 3.A 97.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 7 exceeds the level to keep (1) by 6.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Single sourceSame description as 9 other material numbers
On hand / on order
7 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.9%
stockout risk now 0%
Unit price
Rp 3.2M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 216 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 20.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 2 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PGI-1671B
PRESSURE GAUGE
B100.02
PX_PGI-1923
PP-1445A BTM
C200.02

Lead time and procurement

Lead time 32 ± 24 days (PO history + category, 1 PO lines) · on-time 60%

PR dateTypeQtyUnit priceDeliveryLead time
02 Feb 2026PR03
Regular replenishment
1Rp 3.2M02 Mar 202628 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
27 Feb 20261201000026488Corrective