SPRING,SAFETY VALVE,SIZE QV915,NBR

Material 4100066098 · SPRING · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100066098
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
A (9 of 35 FuncLocs A/B, 25 safety/shutdown valve)
Supplier
SURYA ENERGI JAYA PT
Lead time
129 d · P80 142 d
Unit price
Rp 11.4M

Recommendation

  • 1.Safety-critical element: installed on 25 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 8.1 EA/year: 8.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~129 days; expected demand during lead time 2.9.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 14.
  • 5.On hand 0 + on order 4 is at or below the reorder point: order 10 now.
  • 6.Long lead time: 80% of deliveries took up to 142 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 35 FuncLoc(s), 9 of them criticality A/B.
  • 8.ML early warning: 54% probability of demand in the next 90 days.
Proposed purchase requisition
10 EA
Rp 114.0M · order by 01 Oct 2026
Expected arrival ≈ 129 days
Safety-critical (SCE)Long-leadML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 4
next delivery 29 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 8
Rec. Max
14
order qty 4
Service level
99.9%
stockout risk now 34%
Unit price
Rp 11.4M
PO history
ML early warning: 54% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 4 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 35 functional locations

9 with criticality A/B · 47 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A472.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-513
TURBINE FOR KC-513
A121.53
PY_PRV-1236A
SAFETY VALVE HE-621
A120.47
PX_PRV-403A
SAFETY VALVE HE-532A
A110.47
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_PRV-708C
SAFETY VALVE HE-179D
A100.04
PX_PRV-1456
SAFETY VALVE HE-308C
B110.04
PX_PRV-276A
SAFETY VALVE PP-1657A
B100.04
PX_PRV-1028
SAFETY VALVE VD-727
C400.04
PX_PRV-997A
SAFETY VALVE BF-105
C100.04
PX_KT-383A
TURBINE FOR KC-383A
S273.67

Lead time and procurement

Lead time 129 ± 56 days (PO history, 4 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
14 Sept 2026PR06
Regular replenishment
2Rp 11.2M11 Dec 2026
open
88 d
18 May 2026PR06
Regular replenishment
2Rp 11.6M29 Nov 2026
open
195 d
25 Nov 2025PR04
Regular (other)
3Rp 11.0M08 Mar 2026103 d
30 May 2025PR06
Regular replenishment
3Rp 11.7M14 Sept 2025107 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
11 Jun 2026LowPX_KT-264ALeak from packing
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A

Recent goods issues

Posting dateQtyOrderOrder type
27 Sept 20261206000026719Other maintenance
24 Apr 20262201000027196Corrective
31 Jan 20261201000026900Corrective
24 Dec 20252201000003244Corrective
26 May 20251201000000928Corrective