SPRING,SAFETY VALVE,SIZE HA979,GRAPHITE

Material 4100066184 · SPRING · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100066184
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 10 FuncLocs A/B, 4 safety/shutdown valve)
Supplier
No PO history
Lead time
137 d · P80 196 d
Unit price
Rp 8.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 6.3 EA/year: 6.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~137 days; expected demand during lead time 2.4.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 13.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 13 now.
  • 6.Installed on 10 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
13 EA
Rp 114.6M · order by 01 Oct 2026
Expected arrival ≈ 137 days
Safety-critical (SCE)Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 7
Rec. Max
13
order qty 4
Service level
99.9%
stockout risk now 79%
Unit price
Rp 8.8M
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 355 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 10 functional locations

4 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_PRV-192
SAFETY VALVE VD-884
A120.90
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KT-624A
TURBINE FOR KC-624A
S132.39
PX_PRV-1734D
SAFETY VALVE KC-551D
S120.47
PX_KT-875
TURBINE FOR KC-875
S101.10
PX_PRV-1185
SAFETY VALVE HE-171A
S100.04
PX_PRV-1401
SAFETY VALVE PP-1250
S100.04

Lead time and procurement

Lead time 137 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
13 May 2026LowPX_KT-447KT-447 trip test
19 Apr 2026LowPX_KT-447Follow up after steam upset KT-447
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A

Recent goods issues

Posting dateQtyOrderOrder type
11 Oct 20251205000020548Other maintenance
20 Aug 20252201000004910Corrective