SPRING,SAFETY VALVE,SIZE WR399,INCOLOY
Material 4100066380 · SPRING · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100066380
- Category
- SPRING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 5 FuncLocs A/B, 5 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 137 d · P80 196 d
- Unit price
- Rp 8.8M (est.)
Recommendation
- 1.Safety-critical element: installed on 5 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~137 days; expected demand during lead time 0.4.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 5.On hand 3 + on order 0 is at or below the reorder point: order 2 now.
- 6.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 17.6M · order by 01 Oct 2026
Expected arrival ≈ 137 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 8.8M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 83 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.
Installed on 5 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-995 SAFETY VALVE PP-1830B | A | 1 | 2 | 0.47 |
| PX_PRV-624 SAFETY VALVE HE-232C | B | 1 | 2 | 0.90 |
| PX_PRV-1101 SAFETY VALVE HE-322C | B | 1 | 0 | 0.04 |
| PX_PRV-1319D SAFETY VALVE HE-1277C | S | 1 | 3 | 0.90 |
| PX_PRV-1224 SAFETY VALVE VD-531 | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 137 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Sept 2026 | Low | PX_PRV-1319D | Replace lamp as per PM finding |
| 01 Jul 2026 | Low | PX_PRV-1319D | PRV-1319D passing |
| 04 Apr 2026 | Emergency | PX_PRV-624 | Replace lamp as per PM finding |
| 10 Oct 2025 | Medium | PX_PRV-995 | Replace lamp as per PM finding |
| 07 Jul 2025 | Medium | PX_PRV-624 | PRV-624 passing |
| 20 May 2025 | Low | PX_PRV-1319D | Leak from packing |
| 16 May 2025 | Medium | PX_PRV-995 | Recertification PRV-995 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jul 2026 | 1 | 201000008232 | Corrective |