Sparely
DU

SPRING,SAFETY VALVE,TYPE IM339,A105

Material 4100066587 · SPRING · Plant 1000

SSafety-criticalLong-leadReduceSlow-moving
Material
4100066587
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 2 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
151 d · P80 196 d
Unit price
Rp 29.3M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~151 days; expected demand during lead time 0.1.
  • 4.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.Stock 44 exceeds the level to keep (2) by 42.
  • 6.Long lead time: 80% of deliveries took up to 196 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
44 / 1
next delivery 20 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 29.3M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 272 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 552.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-936
SAFETY VALVE VD-1936
S120.47
PX_PRV-1186
SAFETY VALVE PP-1158
S100.04

Lead time and procurement

Lead time 151 ± 65 days (PO history + category, 2 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
28 Mar 2026PR06
Regular replenishment
1Rp 29.5M08 Jun 202672 d
20 Jan 2026PR05
Project / turnaround
1Rp 29.2M20 Oct 2026
open
273 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Jan 2026MediumPX_PRV-936PRV-936 simmering
13 Jun 2025LowPX_PRV-936Install scaffolding at PRV-936

Recent goods issues

Posting dateQtyOrderOrder type
02 Jan 20261201000038447Corrective