Sparely
DU

SPRING,SAFETY VALVE,MODEL VJ412,NBR

Material 4100066776 · SPRING · Plant 1000

SSafety-criticalReorderCriticalInsurance gap
Material
4100066776
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 2 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
137 d · P80 196 d
Unit price
Rp 8.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~137 days; expected demand during lead time 0.0.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
Proposed purchase requisition
2 EA
Rp 17.6M · order by 01 Oct 2026
Expected arrival ≈ 137 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 3%
Unit price
Rp 8.8M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 134.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1103B
SAFETY VALVE HE-1603
S120.90
PX_KT-778A
TURBINE FOR KC-778A
S101.10

Lead time and procurement

Lead time 137 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Sept 2026MediumPX_PRV-1103BRecertification PRV-1103B
13 Jul 2025MediumPX_PRV-1103BReplace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.