Material 4100067356 · SPRING · Plant 1000

BSafety-criticalLong-leadMaintainInsurance gap
Material
4100067356
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 2 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
RAJAWALI SEJAHTERA ABADI PT
Lead time
168 d · P80 196 d
Unit price
Rp 14.5M

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~168 days; expected demand during lead time 0.0.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 5.Long lead time: 80% of deliveries took up to 196 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 10 May 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 14.5M
PO history
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 2 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-982
SAFETY VALVE VD-671A
B100.04
PY_PRV-190
SAFETY VALVE PP-1934A
S300.04

Lead time and procurement

Lead time 168 ± 65 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
21 Aug 2026PR01
Import / long-lead
2Rp 14.5M10 May 2027
open
262 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.