SPRING,SAFETY VALVE,MODEL AY271,MONEL

Material 4100067860 · SPRING · Plant 1000

SSafety-criticalReorderCriticalInsurance gap
Material
4100067860
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 2 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
137 d · P80 196 d
Unit price
Rp 8.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~137 days; expected demand during lead time 0.1.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
Proposed purchase requisition
2 EA
Rp 17.6M · order by 01 Oct 2026
Expected arrival ≈ 137 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 6%
Unit price
Rp 8.8M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 249.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_PRV-1265A
SAFETY VALVE VD-1610
S100.04

Lead time and procurement

Lead time 137 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
23 Jun 2025MediumPX_KT-383AKT-383A governor valve hunting

Recent goods issues

Never issued in the 17-month history.