DISC,SAFETY VALVE,SIZE YQ886,CS

Material 4100067874 · DISC · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100067874
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
A (7 of 16 FuncLocs A/B, 16 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 171 d
Unit price
Rp 12.5M (est.)

Recommendation

  • 1.Safety-critical element: installed on 16 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 6.0 EA/year: 6.0 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~88 days; expected demand during lead time 1.4.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 10.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
  • 6.Installed on 16 FuncLoc(s), 7 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 125.4M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
10
order qty 3
Service level
99.9%
stockout risk now 65%
Unit price
Rp 12.5M
Category + unit estimate
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 89 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 8 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 16 functional locations

7 with criticality A/B · 19 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-192
SAFETY VALVE VD-884
A120.90
PX_PRV-463B
SAFETY VALVE VD-1404
A110.04
PX_PRV-1249
SAFETY VALVE VD-1218
A100.04
PX_PRV-1554
SAFETY VALVE CL-268
A100.04
PX_PRV-305
SAFETY VALVE VD-996
A100.04
PX_PRV-686
SAFETY VALVE HE-1751C
A100.04
PY_PRV-1355
SAFETY VALVE PP-912B
A100.04
PX_PRV-1028
SAFETY VALVE VD-727
C200.04
PX_PRV-239
SAFETY VALVE VD-1705
C100.04
PX_PRV-822
SAFETY VALVE PP-1471A
C100.04
PY_PRV-1741
SAFETY VALVE HE-660B
C300.04
PX_PRV-1588
SAFETY VALVE VD-1611A
S110.04

Lead time and procurement

Lead time 88 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Mar 2026MediumPX_PRV-192PRV-192 passing
03 Jul 2025MediumPX_PRV-192Recertification PRV-192
28 May 2025MediumPX_PRV-1617APRV-1617A simmering
17 May 2025MediumPX_PRV-463B[MSI-B-25-NPF-127] Permanent repair
09 May 2025LowPX_PRV-1588Install scaffolding at PRV-1588

Recent goods issues

Posting dateQtyOrderOrder type
04 Jul 20261201000004652Corrective
08 Mar 20263201000000371Corrective
07 Mar 20261201000000371Corrective
06 Mar 20262201000013662Corrective
16 Feb 20261201000034591Corrective
08 Nov 20251201000025800Corrective
17 Oct 20251201000014282Corrective
23 Aug 20251201000039902Corrective