DISC,SAFETY VALVE,TYPE WO963,CS

Material 4100067878 · DISC · Plant 1000

ASafety-criticalLong-leadReduceExcess
Material
4100067878
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 11 FuncLocs A/B, 11 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
100 d · P80 171 d
Unit price
Rp 4.2M

Recommendation

  • 1.Safety-critical element: installed on 11 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~100 days; expected demand during lead time 0.4.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
  • 5.Stock 9 exceeds the level to keep (7) by 2.
  • 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 11 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
9 / 1
next delivery 23 Jan 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
7
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 4.2M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 66 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 11 functional locations

3 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-570A
SAFETY VALVE PP-481A
A130.47
PX_PRV-271B
SAFETY VALVE HE-391
A100.04
PX_PRV-1382
SAFETY VALVE PP-1164B
B100.04
PY_PRV-477A
SAFETY VALVE KC-730
C100.04
PX_PRV-1454
SAFETY VALVE PP-315A
S110.04
PX_PRV-229B
SAFETY VALVE PP-615A
S110.04
PX_PRV-575
SAFETY VALVE HE-1537D
S110.04
PX_PRV-1155B
SAFETY VALVE PP-1554
S100.04
PX_PRV-182
SAFETY VALVE PP-507
S100.04
PX_PRV-202
SAFETY VALVE HE-1093A
S100.04
PY_PRV-1062A
SAFETY VALVE HE-912
S100.04

Lead time and procurement

Lead time 100 ± 64 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
09 Sept 2026PR06
Regular replenishment
1Rp 4.2M23 Jan 2027
open
136 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Jul 2026HighPX_PRV-570AInstall scaffolding at PRV-570A
06 Mar 2026MediumPX_PRV-570AInstall scaffolding at PRV-570A
01 Jun 2025LowPX_PRV-570APRV-570A simmering
25 May 2025MediumPX_PRV-575Install scaffolding at PRV-575
19 May 2025LowPX_PRV-1454Leak from packing
05 May 2025MediumPX_PRV-229BPSM25/PRV-229B passing

Recent goods issues

Posting dateQtyOrderOrder type
27 Jul 20262201000021629Corrective
19 Dec 20251201000038526Corrective