DISC,SAFETY VALVE,TYPE WO963,CS
Material 4100067878 · DISC · Plant 1000
ASafety-criticalLong-leadReduceExcess
- Material
- 4100067878
- Category
- DISC
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 11 FuncLocs A/B, 11 safety/shutdown valve)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 100 d · P80 171 d
- Unit price
- Rp 4.2M
Recommendation
- 1.Safety-critical element: installed on 11 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~100 days; expected demand during lead time 0.4.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
- 5.Stock 9 exceeds the level to keep (7) by 2.
- 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 11 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
9 / 1
next delivery 23 Jan 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
7
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 4.2M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 66 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 11 functional locations
3 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-570A SAFETY VALVE PP-481A | A | 1 | 3 | 0.47 |
| PX_PRV-271B SAFETY VALVE HE-391 | A | 1 | 0 | 0.04 |
| PX_PRV-1382 SAFETY VALVE PP-1164B | B | 1 | 0 | 0.04 |
| PY_PRV-477A SAFETY VALVE KC-730 | C | 1 | 0 | 0.04 |
| PX_PRV-1454 SAFETY VALVE PP-315A | S | 1 | 1 | 0.04 |
| PX_PRV-229B SAFETY VALVE PP-615A | S | 1 | 1 | 0.04 |
| PX_PRV-575 SAFETY VALVE HE-1537D | S | 1 | 1 | 0.04 |
| PX_PRV-1155B SAFETY VALVE PP-1554 | S | 1 | 0 | 0.04 |
| PX_PRV-182 SAFETY VALVE PP-507 | S | 1 | 0 | 0.04 |
| PX_PRV-202 SAFETY VALVE HE-1093A | S | 1 | 0 | 0.04 |
| PY_PRV-1062A SAFETY VALVE HE-912 | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 100 ± 64 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Sept 2026 | PR06 Regular replenishment | 1 | Rp 4.2M | 23 Jan 2027 open | 136 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Jul 2026 | High | PX_PRV-570A | Install scaffolding at PRV-570A |
| 06 Mar 2026 | Medium | PX_PRV-570A | Install scaffolding at PRV-570A |
| 01 Jun 2025 | Low | PX_PRV-570A | PRV-570A simmering |
| 25 May 2025 | Medium | PX_PRV-575 | Install scaffolding at PRV-575 |
| 19 May 2025 | Low | PX_PRV-1454 | Leak from packing |
| 05 May 2025 | Medium | PX_PRV-229B | PSM25/PRV-229B passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Jul 2026 | 2 | 201000021629 | Corrective |
| 19 Dec 2025 | 1 | 201000038526 | Corrective |