DISC,SAFETY VALVE,SIZE CL481,INCOLOY

Material 4100067911 · DISC · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100067911
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 13 FuncLocs A/B, 13 safety/shutdown valve)
Supplier
SURYA PERKASA SENTOSA PT
Lead time
90 d · P80 162 d
Unit price
Rp 35.1M

Recommendation

  • 1.Safety-critical element: installed on 13 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.9 EA/year: 2.9 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~90 days; expected demand during lead time 0.7.
  • 4.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 5.On hand 0 + on order 2 is at or below the reorder point: order 3 now.
  • 6.Long lead time: 80% of deliveries took up to 162 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 13 FuncLoc(s), 3 of them criticality A/B.
  • 8.ML early warning: 35% probability of demand in the next 90 days.
Proposed purchase requisition
3 EA
Rp 105.2M · order by 01 Oct 2026
Expected arrival ≈ 90 days
Safety-critical (SCE)Long-leadML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 08 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.4%
stockout risk now 3%
Unit price
Rp 35.1M
PO history
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 1 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 13 functional locations

3 with criticality A/B · 13 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1591
SAFETY VALVE HE-779D
A120.47
PX_PRV-929A
SAFETY VALVE PP-1076A
A110.04
PX_PRV-1630
SAFETY VALVE KC-178A
A100.04
PX_PRV-1154B
SAFETY VALVE PP-1765B
C100.04
PX_PRV-1335
SAFETY VALVE VD-721B
S130.47
PX_PRV-761
SAFETY VALVE PP-1011D
S120.90
PX_PRV-1670
SAFETY VALVE KC-891A
S110.04
PX_PRV-1155B
SAFETY VALVE PP-1554
S100.04
PX_PRV-1401A
SAFETY VALVE HE-275C
S100.04
PX_PRV-1410C
SAFETY VALVE PP-106B
S100.04
PX_PRV-1839D
SAFETY VALVE PP-448
S100.04
PX_PRV-1854A
SAFETY VALVE VD-1695D
S100.04

Lead time and procurement

Lead time 90 ± 62 days (PO history, 6 PO lines) · on-time 25%

PR dateTypeQtyUnit priceDeliveryLead time
16 Aug 2026PR06
Regular replenishment
2Rp 36.6M08 Oct 2026
open
53 d
24 Jun 2026PR03
Regular replenishment
2Rp 34.2M24 Jul 202630 d
05 May 2026PR06
Regular replenishment
1Rp 34.6M19 Jun 202645 d
12 Mar 2026PR03
Regular replenishment
1Rp 34.7M29 Aug 2026170 d
10 Mar 2026PR06
Regular replenishment
2Rp 35.4M01 Jun 202683 d
18 Sept 2025PR06
Regular replenishment
1Rp 35.8M27 Feb 2026162 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_PRV-761Recertification PRV-761
17 Jul 2026MediumPX_PRV-1335Replace lamp as per PM finding
06 May 2026MediumPX_PRV-1335Install scaffolding at PRV-1335
06 Sept 2025MediumPX_PRV-1591Leak from packing
03 Aug 2025LowPX_PRV-1335Install scaffolding at PRV-1335
15 Jun 2025MediumPX_PRV-761Replace lamp as per PM finding
08 May 2025MediumPX_PRV-929APRV-929A simmering
05 May 2025MediumPX_PRV-1670Replace lamp as per PM finding
02 May 2025MediumPX_PRV-1591Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000031926Corrective
10 Aug 20261201000006061Corrective
20 Dec 20251201000030487Corrective
14 Jul 20251201000035044Corrective