DISC,SAFETY VALVE,SIZE CL481,INCOLOY
Material 4100067911 · DISC · Plant 1000
ASafety-criticalLong-leadReorderCriticalStockout
- Material
- 4100067911
- Category
- DISC
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 13 FuncLocs A/B, 13 safety/shutdown valve)
- Supplier
- SURYA PERKASA SENTOSA PT
- Lead time
- 90 d · P80 162 d
- Unit price
- Rp 35.1M
Recommendation
- 1.Safety-critical element: installed on 13 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 2.9 EA/year: 2.9 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~90 days; expected demand during lead time 0.7.
- 4.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 5.On hand 0 + on order 2 is at or below the reorder point: order 3 now.
- 6.Long lead time: 80% of deliveries took up to 162 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 13 FuncLoc(s), 3 of them criticality A/B.
- 8.ML early warning: 35% probability of demand in the next 90 days.
Proposed purchase requisition
3 EA
Rp 105.2M · order by 01 Oct 2026
Expected arrival ≈ 90 days
Safety-critical (SCE)Long-leadML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 08 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.4%
stockout risk now 3%
Unit price
Rp 35.1M
PO history
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 1 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 13 functional locations
3 with criticality A/B · 13 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-1591 SAFETY VALVE HE-779D | A | 1 | 2 | 0.47 |
| PX_PRV-929A SAFETY VALVE PP-1076A | A | 1 | 1 | 0.04 |
| PX_PRV-1630 SAFETY VALVE KC-178A | A | 1 | 0 | 0.04 |
| PX_PRV-1154B SAFETY VALVE PP-1765B | C | 1 | 0 | 0.04 |
| PX_PRV-1335 SAFETY VALVE VD-721B | S | 1 | 3 | 0.47 |
| PX_PRV-761 SAFETY VALVE PP-1011D | S | 1 | 2 | 0.90 |
| PX_PRV-1670 SAFETY VALVE KC-891A | S | 1 | 1 | 0.04 |
| PX_PRV-1155B SAFETY VALVE PP-1554 | S | 1 | 0 | 0.04 |
| PX_PRV-1401A SAFETY VALVE HE-275C | S | 1 | 0 | 0.04 |
| PX_PRV-1410C SAFETY VALVE PP-106B | S | 1 | 0 | 0.04 |
| PX_PRV-1839D SAFETY VALVE PP-448 | S | 1 | 0 | 0.04 |
| PX_PRV-1854A SAFETY VALVE VD-1695D | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 90 ± 62 days (PO history, 6 PO lines) · on-time 25%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Aug 2026 | PR06 Regular replenishment | 2 | Rp 36.6M | 08 Oct 2026 open | 53 d |
| 24 Jun 2026 | PR03 Regular replenishment | 2 | Rp 34.2M | 24 Jul 2026 | 30 d |
| 05 May 2026 | PR06 Regular replenishment | 1 | Rp 34.6M | 19 Jun 2026 | 45 d |
| 12 Mar 2026 | PR03 Regular replenishment | 1 | Rp 34.7M | 29 Aug 2026 | 170 d |
| 10 Mar 2026 | PR06 Regular replenishment | 2 | Rp 35.4M | 01 Jun 2026 | 83 d |
| 18 Sept 2025 | PR06 Regular replenishment | 1 | Rp 35.8M | 27 Feb 2026 | 162 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_PRV-761 | Recertification PRV-761 |
| 17 Jul 2026 | Medium | PX_PRV-1335 | Replace lamp as per PM finding |
| 06 May 2026 | Medium | PX_PRV-1335 | Install scaffolding at PRV-1335 |
| 06 Sept 2025 | Medium | PX_PRV-1591 | Leak from packing |
| 03 Aug 2025 | Low | PX_PRV-1335 | Install scaffolding at PRV-1335 |
| 15 Jun 2025 | Medium | PX_PRV-761 | Replace lamp as per PM finding |
| 08 May 2025 | Medium | PX_PRV-929A | PRV-929A simmering |
| 05 May 2025 | Medium | PX_PRV-1670 | Replace lamp as per PM finding |
| 02 May 2025 | Medium | PX_PRV-1591 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 1 | 201000031926 | Corrective |
| 10 Aug 2026 | 1 | 201000006061 | Corrective |
| 20 Dec 2025 | 1 | 201000030487 | Corrective |
| 14 Jul 2025 | 1 | 201000035044 | Corrective |