DISC,SAFETY VALVE,SIZE GD989,GRAPHITE

Material 4100068029 · DISC · Plant 1000

BSafety-criticalReorderCriticalInsurance gap
Material
4100068029
Category
DISC
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 4 FuncLocs A/B, 4 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 171 d
Unit price
Rp 12.5M (est.)

Recommendation

  • 1.Safety-critical element: installed on 4 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~88 days; expected demand during lead time 0.0.
  • 4.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
  • 6.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 12.5M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.0%
stockout risk now 1%
Unit price
Rp 12.5M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 38.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-153
SAFETY VALVE HE-1368C
B110.47
PX_PRV-852
SAFETY VALVE HE-981
C100.04
PX_PRV-1938B
SAFETY VALVE HE-1898A
S120.47
PX_PRV-699D
SAFETY VALVE HE-593C
S100.04

Lead time and procurement

Lead time 88 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Jan 2026MediumPX_PRV-1938BRecertification PRV-1938B
19 Jun 2025MediumPX_PRV-153Replace lamp as per PM finding
31 May 2025LowPX_PRV-1938BInstall scaffolding at PRV-1938B

Recent goods issues

Never issued in the 17-month history.