DISC,SAFETY VALVE,SIZE GD989,GRAPHITE
Material 4100068029 · DISC · Plant 1000
BSafety-criticalReorderCriticalInsurance gap
- Material
- 4100068029
- Category
- DISC
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 4 FuncLocs A/B, 4 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 88 d · P80 171 d
- Unit price
- Rp 12.5M (est.)
Recommendation
- 1.Safety-critical element: installed on 4 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~88 days; expected demand during lead time 0.0.
- 4.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
- 6.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 12.5M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.0%
stockout risk now 1%
Unit price
Rp 12.5M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 38.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-153 SAFETY VALVE HE-1368C | B | 1 | 1 | 0.47 |
| PX_PRV-852 SAFETY VALVE HE-981 | C | 1 | 0 | 0.04 |
| PX_PRV-1938B SAFETY VALVE HE-1898A | S | 1 | 2 | 0.47 |
| PX_PRV-699D SAFETY VALVE HE-593C | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 88 ± 64 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Jan 2026 | Medium | PX_PRV-1938B | Recertification PRV-1938B |
| 19 Jun 2025 | Medium | PX_PRV-153 | Replace lamp as per PM finding |
| 31 May 2025 | Low | PX_PRV-1938B | Install scaffolding at PRV-1938B |
Recent goods issues
Never issued in the 17-month history.