DISC,SAFETY VALVE,TYPE FI262,INCOLOY

Material 4100068188 · DISC · Plant 1000

CSafety-criticalReorderCriticalStockout
Material
4100068188
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 2 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
88 d · P80 171 d
Unit price
Rp 12.5M (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~88 days; expected demand during lead time 0.1.
  • 4.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
Proposed purchase requisition
2 EA
Rp 25.1M · order by 01 Oct 2026
Expected arrival ≈ 88 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.6%
stockout risk now 9%
Unit price
Rp 12.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 398 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 344.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 2 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-434
SAFETY VALVE PP-383
C110.04
PX_PRV-852D
SAFETY VALVE PP-296A
S200.04

Lead time and procurement

Lead time 88 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 May 2025HighPX_PRV-434Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
29 Aug 20251201000002071Corrective
28 Aug 20251201000002071Corrective