DISC,SAFETY VALVE,SIZE GC837,GRAPHITE
Material 4100069027 · DISC · Plant 1000
SSafety-criticalLong-leadMonitorSlow-moving
- Material
- 4100069027
- Category
- DISC
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 2 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- SINAR INSTRUMEN NUSANTARA PT
- Lead time
- 86 d · P80 171 d
- Unit price
- Rp 33.5M
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~86 days; expected demand during lead time 0.1.
- 4.A 95.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
- 5.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
95.2%
stockout risk now 5%
Unit price
Rp 33.5M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 277 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 196.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-1448 SAFETY VALVE PP-752B | S | 1 | 0 | 0.04 |
| PX_PRV-819 SAFETY VALVE PP-326A | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 86 ± 64 days (PO history + category, 1 PO lines) · on-time 31%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Sept 2025 | PR03 Regular replenishment | 1 | Rp 33.5M | 21 Nov 2025 | 80 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Dec 2025 | 3 | 201000023691 | Corrective |