Sparely
DU

DISC,SAFETY VALVE,TYPE OD677,A105

Material 4100069058 · DISC · Plant 1000

SSafety-criticalLong-leadReduceNon-moving
Material
4100069058
Category
DISC
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
83 d · P80 171 d
Unit price
Rp 9.2M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~83 days; expected demand during lead time 0.0.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 5.Stock 19 exceeds the level to keep (1) by 18.
  • 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadSingle source
On hand / on order
19 / 0
no open PO
Today Min / Max
10 / 22
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 9.2M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PRV-1778
SAFETY VALVE KC-675
S100.04

Lead time and procurement

Lead time 83 ± 64 days (PO history + category, 2 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
20 Mar 2026PR03
Regular replenishment
2Rp 9.0M16 Jun 202688 d
19 Oct 2025PR03
Regular replenishment
2Rp 9.4M19 Dec 202561 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.